The Garden Studio Build, Day 2

Well day two wasn’t as fun as day one.  It started with this, and a look at the interior:

then on to roofing and wrapping:

Then they tidied up and battened down the hatches for the 5 storm days ahead.  They’ll be back Monday morning.

 

 

 

 

8 Comments

  1. Two skylights on the back (south-facing) slope…then the window corner and the door is all windows. Track lighting. Our goal is to have it all ready for Sam at Thanksgiving!

  2. Monday wiring, roof, begin shingles, call for inspection, insulation, walls…Bill will come along after and put down a vnyl tile floor and paint the walls. Exterior trim we’ll maybe paint in the spring…as it is primed. I’m thinking by Thanksgiving it will be a cozy and bright spot in my life…I hope.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s