The bathroom construction at Court Street began heating up as the week drew to a close. After the first coat of concrete in the construction of the “pan” on the shower floor, came a rubber liner, with a bucket of water in it. This had to sit for 24 hours and then be inspected…all of us hoping for no leaks…but it needed a boat…and then more concrete…and then all hell broke loose
…we came to the beach…:)